Request a Quote
Leave Your Message

Single-Channel Intelligent Smoke Generator

Model HRH-SM120 single-channel intelligent smoke generator adopts precision motor and control unit which meet ISO3308 and ISO4387 standard smoke methods.

    Features

    1.Load with two cigarettes simultaneously.
    2.Smoke capacity: 15-60ml.
    3.Smoke cycle: 10-240s.
    4.Smoke curve: standard bell-shaped curve or other customized curves.
    5.Measurement capacity accuracy: ±0.01 mL 
    6.Control capacity accuracy: ±0.01 mL 
    7.Measurement time accuracy: ±0.01 s 
    8.Control time accuracy: ±0.01 s 
    9.Puff duration: 3–60 s adjustable 
    10.Rated voltage: 220 V 
    11.Main unit weight: 5 kg 
    12.Main unit dimensions: 37 × 23 × 38 (cm)

    Features

    Working Environment

    Temperature: 0 ℃–60 ℃ 
    Humidity: 5%–95% (non-condensing) 

    Storage Environment

    Temperature: -20 ℃–70 ℃ 
    Humidity: 5%–95% (non-condensing) 

    Storage EnvironmentStorage Environment2

    Routine Maintenance

    1.If the tar cannot be cleaned thoroughly after prolonged experiments, remove the syringe, pull out the plunger, and clean it with a soft test tube brush. After cleaning, apply an appropriate amount of Vaseline around the plunger base (the white front-end part) for lubrication. 
    2.The tubing used in this product is 4x6mm peristaltic pump tubing, with a hardness of approximately Shore 55A. During experiments, it shall be replaced regularly. Compliant tubing can be procured independently or purchased through our Company's sales department. 
    3.The maximum service life of the pinch valve used in this product is 10 million cycles. Replace it in advance to avoid affecting the experiment.

    Pinch Valve Replacement Steps

    1.Remove the silicone tubing from the pinch valve. 
    2.Use a hex wrench to remove the four screws. 
    3.Disconnect the wiring of the pinch valve (a plug-in terminal connector is used here; press the middle protrusion and pull firmly apart). 
    4.Finally, use a hex wrench to remove the screws on the pinch valve, and then remove the pinch valve. 
    5.Install the new pinch valve by following the reverse order of Steps 4-3-2-1.

    Application

    Applicable to various toxicology research centers, animal smoking poisoning tests, respiratory laboratories of hospitals, technical laboratories of cigarette factories for smoke research, etc.

    Make An AppointmentLEAVE YOUR MESSAGE